Sunday, June 17, 2012

UPDATES:

     We are planning to build models of VAWT like the Savonious and the Lenz2 turbines. We shall attache stepper motors which have permanent magnets inside (PM). We plan of table top models to be spun by an E fan or a "garden" model, sitting on a 10 foot poles on the ground.

     On solar panels, it is in the news that ADB is allocating     70M dollars for alternative energy investgments. We believe this will be through banks.

     Solar Panels is down to about P150/watts, so a 100 wattter will cost P15k. Output is 5.6 ampere and given 8 hours in day with sunlight, it will produce rought 45 AMPERE-HOUR.

     What is 45 AH? Well, it can run 45 20 watts flourescent for 1 hour. or 9 for 5 hours.


BK